Export to Swift Apps WBS App
-
Open a document in Roadmap app, and to export as a .wbs file
-
Update the options and to generate the WBS file.
- iOS file activity panel will display. If Swift Apps WBS app installed (which is only available for the iPad), we can choose the "Copy to WBS" item to import as a new WBS document in WBS app